Time Series Forecast
Study guide: Exam MAS-II
A time series forecast is the conditional expectation of a future value given the history, \hat Y_{t+h} = E[Y_{t+h} \mid Y_t, Y_{t-1}, \dots], together with an interval expressing how uncertain it is. Producing and reading one is objective D4.
\hat{Y}_{t+h} = E\!\left[Y_{t+h} \mid \mathcal{F}_t\right]
\hat{Y}_{t+h} \pm z_{1-\alpha/2}\,\sigma\sqrt{\textstyle\sum_{j=0}^{h-1}\psi_j^{2}}
- Build it recursively: replace future shocks with 0, future observations with their forecasts, and known past values with themselves
- The
\psi_jare the coefficients of the infinite MA representation; for an AR(1),\psi_j = \phi^{j}, so theh-step variance is\sigma^{2}\dfrac{1-\phi^{2h}}{1-\phi^{2}} - Where each model converges: a stationary AR decays to the mean with a bounded interval; an MA(
q) hits the mean exactly ath > q; a Random Walk stays flat at the last value with an interval widening as\sqrt{h} - The intervals assume the model and its parameters are correct — they carry process variance only, no parameter or model uncertainty, so they are optimistic in practice
- Assess a forecast on a held-out tail of the series, not on the fitted data, using MAE, RMSE or MAPE
Two-Step Forecast Interval for an AR(1)
Y_t = 20 + 0.6Y_{t-1} + \varepsilon_t,\sigma = 4, andY_{50} = 61. Give the two-step forecast and a 95% interval.Answer
\hat Y_{51} = 20 + 0.6(61) = 56.6 \qquad \hat Y_{52} = 20 + 0.6(56.6) = 53.96Two-step error is\varepsilon_{52} + \phi\varepsilon_{51}, with variance\sigma^2(1 + \phi^{2}) = 16(1.36) = 21.76and SD4.665:53.96 \pm 1.96(4.665) = (44.8,\ 63.1)The one-step interval would be the narrower\pm 1.96(4) = \pm 7.84. Ashgrows the forecast converges to\mu = 20/0.4 = 50and the SD to4/\sqrt{1-0.36} = 5.