Risk Loads
Study guide: Exam 9
Risk Loads are the amounts added to expected loss to pay an insurer's capital providers for bearing the risk of a contract. Expected loss plus the risk load is the risk-loaded technical premium: the price a pricing model indicates for the risk itself, before expenses and commercial adjustments.
P = E[X] + R(X)
Xis the loss to the contract (after its limits and attachment),R(X) \geq 0the risk load. In Mildenhall and Major's notation the risk load is the marginM = P - L— see Insurance Margin.- Classical premium principles, each a Risk Measure applied to
X:- expected value:
P = (1 + \theta)\,E[X]— the load ignores variability, so a remote catastrophe layer and a stable working layer with the same mean pay the same load; - standard deviation:
P = E[X] + k\,\sigma(X)— the load scales with share, so a 50% share pays half; - variance:
P = E[X] + k\,\text{Var}(X)— the load scales with the square of share, so a 50% share pays a quarter and two 50% shares together pay half the load on 100%.
- expected value:
- Cost-of-capital loads set capital first, with a capital risk measure (VaR, TVaR or a regulatory standard), then charge the target return on it:
R = \iota\,Q = \delta\,(a - L), whereais assets,\iotathe target return and\delta = \iota/(1+\iota). See Cost of Capital and Risk Capital. - Distortion loads
R = \rho_g(X) - E[X]weight remote layers more heavily than their probability. The distortion can be calibrated to observed market prices, for example of catastrophe bonds and reinsurance layers. - Loads are not additive. Pooling reduces risk, so the load on a portfolio is less than the sum of the stand-alone loads. The portfolio load has to be set top-down and allocated to lines or policies — the problem of Risk-Adjusted Pricing. In Exam 5 ratemaking the same idea sits inside the Profit and Contingency Provision.
Five Risk Loads for One Catastrophe Layer Losses ($ millions) to a $10M xs $10M catastrophe layer are
0with probability0.90,5with probability0.06and10(a full limit loss) with probability0.04. Compute the technical premium under (a) the expected value principle with\theta = 0.5, (b) the standard deviation principle withk = 0.25, (c) the variance principle withk = 0.05, (d) a proportional hazard distortiong(s) = s^{0.7}, and (e) a constant15\%cost of capital with the layer fully collateralised (a = 10).Answer
\begin{align*} E[X] &= 0.06(5) + 0.04(10) \\ &= 0.70 \\ \text{Var}(X) &= 0.06(25) + 0.04(100) - 0.70^2 \\ &= 5.01 \\ \sigma(X) &= 2.238 \end{align*}For (d),
S = 0.10on[0, 5)and0.04on[5, 10). For (e),\delta = 0.15/1.15 = 0.1304.\begin{align*} P_{(a)} &= 1.5(0.70) \\ &= 1.050 \\ P_{(b)} &= 0.70 + 0.25(2.238) \\ &= 1.260 \\ P_{(c)} &= 0.70 + 0.05(5.01) \\ &= 0.951 \\ P_{(d)} &= 5(0.10^{0.7}) + 5(0.04^{0.7}) \\ &= 0.998 + 0.525 \\ &= 1.523 \\ P_{(e)} &= 0.70 + 0.1304(10 - 0.70) \\ &= 1.913 \end{align*}The same loss distribution produces risk loads from
0.25to1.21— the choice of measure and parameter, not the data, drives the price. The cost-of-capital price is the highest because the layer ties up $10M of capital against $0.7M of expected loss; its loss ratio is0.70/1.913 = 37\%, and its return is1.213/(10 - 1.913) = 15\%as required.
The Diversification Problem Two independent lines each have expected loss
50and standard deviation30. The insurer loads premiums at0.2standard deviations. Compare the stand-alone loads with the load on the combined portfolio.Answer
\begin{align*} \text{Stand-alone} &= 0.2(30) + 0.2(30) \\ &= 12.0 \\ \sigma_{\text{pool}} &= \sqrt{30^2 + 30^2} \\ &= 42.43 \\ \text{Pooled load} &= 0.2(42.43) \\ &= 8.49 \end{align*}Pooling saves
3.51of load. If each line is priced stand-alone the insurer over-charges by41\%of the load it needs, and a competitor that passes the diversification benefit on will win the business. The pooled load has to be allocated — here symmetry gives4.24each — and for unequal or correlated lines the allocation method determines each line's price.