Insurance Margin
Study guide: Exam 9
Insurance Margin M is the part of the premium above expected loss — in Mildenhall and Major's notation M = P - L. It is what policyholders pay for the use of the capital that makes their insurer's promise credible, and equally the owners' expected profit for providing that capital.
M = P - L
M = \iota\, Q = \delta\,(a - L)
Pis premium,Lexpected loss (E[X \wedge a]strictly),Q = a - Pcapital,aassets,\iota = M/Qthe return and\delta = \iota/(1+\iota). In the one-period model with no expenses or investment income, the margin is the entire expected underwriting profit and plays the role of the risk load.- Why
\delta(a - L). Assets above expected loss,a - L, are the "unfunded" part of the promise. Owners pay inQat inception and expecta - L = M + Qback, so premium funds the expected loss plus a fraction\deltaofa - Land investors fund the remaining\nu = 1 - \delta. - Margin ratio
M/P = 1 - L/Pis the complement of the loss ratio. Multiplied by leverageP/Qit gives the return — see Insurance Profitability. - Gross versus net of expenses. Expenses enlarge the premium without changing the margin, so the same margin is a smaller percentage of an expense-loaded premium. Quote margins on a stated basis.
- Where the margin sits. Pricing layer by layer, a distortion
gcharges marging(S(x)) - S(x)per unit of the layer atx. A constant cost of capital (g(s) = \nu s + \delta) charges almost\deltaper unit of capacity whatever the layer's attachment probability, which loads remote layers heavily; other distortions spread the margin more evenly. Exam 5's counterpart is the Profit and Contingency Provision.
The Margin a Target Return Requires A book has expected loss
60and is supported by assets of100. Owners require10\%. Find the margin, premium and capital, then express the margin as a percentage of premium before and after grossing up for a25\%expense ratio.Answer
\begin{align*} \delta &= \frac{0.10}{1.10} \\ &= 0.09091 \\ M &= 0.09091(100 - 60) \\ &= 3.64 \\ P &= 60 + 3.64 \\ &= 63.64 \\ Q &= 100 - 63.64 \\ &= 36.36 \end{align*}Check:
3.64/36.36 = 10\%. The margin is3.64/63.64 = 5.7\%of the risk premium. Grossed up, the premium is63.64/0.75 = 84.85and the same margin is3.64/84.85 = 4.3\%of it — a lower-looking figure with no change in profitability.
Where a Constant Cost of Capital Puts the Margin A catastrophe portfolio's loss
X($ millions) is0,10,50or100with probabilities0.80,0.12,0.06and0.02;E[X] = 6.2and assets area = 100. At\iota = 15\%(\nu = 0.8696,\delta = 0.1304), allocate the margin to the layers0–10,10–50and50–100.Answer Each layer's attachment probability is
S = 0.20,0.08and0.02. The priced probability isg(S) = 0.8696\,S + 0.1304, and the margin per unit of layer isg(S) - S:\begin{align*} M_{0\text{--}10} &= 10(0.3043 - 0.20) \\ &= 1.04 \\ M_{10\text{--}50} &= 40(0.2000 - 0.08) \\ &= 4.80 \\ M_{50\text{--}100} &= 50(0.1478 - 0.02) \\ &= 6.39 \end{align*}The total,
12.23, matches\delta(a - L) = 0.1304(93.8). The top layer carries16\%of the expected loss (1.0of6.2) but52\%of the margin: a constant cost of capital charges for capacity, not for the chance of using it.