Actuarial Notes

Insurance Margin

Study guide: Exam 9

Insurance Margin M is the part of the premium above expected loss — in Mildenhall and Major's notation M = P - L. It is what policyholders pay for the use of the capital that makes their insurer's promise credible, and equally the owners' expected profit for providing that capital.

M = P - L

M = \iota\, Q = \delta\,(a - L)

  • P is premium, L expected loss (E[X \wedge a] strictly), Q = a - P capital, a assets, \iota = M/Q the return and \delta = \iota/(1+\iota). In the one-period model with no expenses or investment income, the margin is the entire expected underwriting profit and plays the role of the risk load.
  • Why \delta(a - L). Assets above expected loss, a - L, are the "unfunded" part of the promise. Owners pay in Q at inception and expect a - L = M + Q back, so premium funds the expected loss plus a fraction \delta of a - L and investors fund the remaining \nu = 1 - \delta.
  • Margin ratio M/P = 1 - L/P is the complement of the loss ratio. Multiplied by leverage P/Q it gives the return — see Insurance Profitability.
  • Gross versus net of expenses. Expenses enlarge the premium without changing the margin, so the same margin is a smaller percentage of an expense-loaded premium. Quote margins on a stated basis.
  • Where the margin sits. Pricing layer by layer, a distortion g charges margin g(S(x)) - S(x) per unit of the layer at x. A constant cost of capital (g(s) = \nu s + \delta) charges almost \delta per unit of capacity whatever the layer's attachment probability, which loads remote layers heavily; other distortions spread the margin more evenly. Exam 5's counterpart is the Profit and Contingency Provision.

The Margin a Target Return Requires A book has expected loss 60 and is supported by assets of 100. Owners require 10\%. Find the margin, premium and capital, then express the margin as a percentage of premium before and after grossing up for a 25\% expense ratio.

Answer

\begin{align*}
\delta &= \frac{0.10}{1.10} \\
&= 0.09091 \\
M &= 0.09091(100 - 60) \\
&= 3.64 \\
P &= 60 + 3.64 \\
&= 63.64 \\
Q &= 100 - 63.64 \\
&= 36.36
\end{align*}

Check: 3.64/36.36 = 10\%. The margin is 3.64/63.64 = 5.7\% of the risk premium. Grossed up, the premium is 63.64/0.75 = 84.85 and the same margin is 3.64/84.85 = 4.3\% of it — a lower-looking figure with no change in profitability.

Where a Constant Cost of Capital Puts the Margin A catastrophe portfolio's loss X ($ millions) is 0, 10, 50 or 100 with probabilities 0.80, 0.12, 0.06 and 0.02; E[X] = 6.2 and assets are a = 100. At \iota = 15\% (\nu = 0.8696, \delta = 0.1304), allocate the margin to the layers 0–10, 10–50 and 50–100.

Answer Each layer's attachment probability is S = 0.20, 0.08 and 0.02. The priced probability is g(S) = 0.8696\,S + 0.1304, and the margin per unit of layer is g(S) - S:

\begin{align*}
M_{0\text{--}10} &= 10(0.3043 - 0.20) \\
&= 1.04 \\
M_{10\text{--}50} &= 40(0.2000 - 0.08) \\
&= 4.80 \\
M_{50\text{--}100} &= 50(0.1478 - 0.02) \\
&= 6.39
\end{align*}

The total, 12.23, matches \delta(a - L) = 0.1304(93.8). The top layer carries 16\% of the expected loss (1.0 of 6.2) but 52\% of the margin: a constant cost of capital charges for capacity, not for the chance of using it.