Caseload Effect
Caseload effect is the dependence of reporting speed on the number of claims. A claim is more likely to be reported in a timely fashion when the caseload is low, so the expected proportion reported by a given age, E(X \mid Y = y)/y, falls as the number of claims y grows. Brosius (1993) models it by giving the expected reported amount an intercept.
E(X \mid Y = y) = d\,y + x_0
\frac{E(X \mid Y = y)}{y} = d + \frac{x_0}{y}
L(x) = Z\,\frac{x - x_0}{d} + (1 - Z)\,E(Y)
Yis the ultimate (claims incurred) andXthe amount reported at the evaluation age, withd \neq 0and, presumably,dandx_0both positive. Settingx_0 = 0gives proportional reporting, Brosius's Development Formula 2. The last block is his Development Formula 3, with the same credibilityZ = VHM/(VHM + EVPV), where the VHM and EVPV are those ofXgivenY.- What it does to development factors. The expected factor to ultimate for a year with
yclaims is1/(d + x_0/y). That is smaller for a light year than for a heavy one, so a single link ratio, which assumes the ratio is a constantd, cannot fit both. Even with perfectly predictable reporting (EVPV = 0,Z = 1), the best estimate(x - x_0)/dis a line with a negative intercept rather than a multiple ofx. - Why least squares still works.
L(x)is still linear inx. Least squares development fits the line directly from past years, so it makes sense even when the development ratio varies with the caseload.x_0andd, which may be impossible to determine in practice, are never needed. The proof shiftsXbyx_0:W = X - x_0has the same EVPV and VHM, so Formula 2 applies toW. - The model implies
E(X \mid Y = 0) = x_0 > 0, which Brosius concedes may be undesirable. Adjuster caseloads are also among the claims processing conditions that change the timing of development.
Development Ratios and the Credibility Estimate Under a Caseload Effect For a small line, claims reported by year-end satisfy
E(X \mid Y = y) = 0.5\,y + 3. The number of claims incurredYhas mean20and variance40, and\mathrm{Var}(X \mid Y = y) = 0.25\,y.(a) Find the expected development ratio for years with
10,20and40claims. (b) This year15claims have been reported. Estimate the ultimate count with Development Formula 3, and compare the link ratio set at an average year.Answer (a) The ratio is
d + x_0/y = 0.5 + 3/y:
Claims yReported ratio Factor to ultimate 100.8001.250200.6501.538400.5751.739Light years report faster, so one development factor cannot suit all three.
(b) The credibility weight:
\begin{align*} VHM &= \mathrm{Var}(0.5\,Y + 3) \\ &= 0.25 \times 40 \\ &= 10 \\ EVPV &= E(0.25\,Y) \\ &= 5 \\ Z &= \frac{10}{10 + 5} \\ &= 2/3 \end{align*}Then Formula 3 gives:
\begin{align*} L(15) &= \tfrac{2}{3} \cdot \frac{15 - 3}{0.5} + \tfrac{1}{3}(20) \\ &= 16 + 6.67 \\ &= 22.67 \end{align*}Check with Formula 1. Here
E(X) = 0.5(20) + 3 = 13,\mathrm{Cov}(X, Y) = 0.5 \times 40 = 20and\mathrm{Var}(X) = VHM + EVPV = 15:\begin{align*} L(15) &= (15 - 13)\,\tfrac{20}{15} + 20 \\ &= 22.67 \end{align*}The link ratio of an average year is
20/13 = 1.538, which gives15 \times 1.538 = 23.08. Two effects separate the estimates:
- Inverting the reporting line gives
(15 - 3)/0.5 = 24. That is above23.08because a heavier-than-average year reports a smaller share, so it needs a larger factor than the average year's.- Credibility then pulls the
24one-third of the way back toE(Y) = 20, giving22.67.A least squares line through past years would approach
L(x) = \tfrac{4}{3}x + 2.67, without anyone knowingdorx_0.