Least Squares Development Method
Least squares development estimates a later value y of an accident year's losses from its current value x with a straight line L(x) = a + bx, fitted by least squares to the (x, y) pairs of earlier accident years. Brosius (1993) shows that this line is, apart from sampling error, the best linear approximation to the Bayesian estimate E(Y \mid X = x). It is a credibility method for development that is useful when the data are thin and random fluctuations are severe.
L(x) = a + bx
b = \frac{\overline{xy} - \bar{x}\,\bar{y}}{\overline{x^2} - \bar{x}^2}
a = \bar{y} - b\,\bar{x}
- Bars are averages over the prior years, so
\overline{xy}is the mean of the products and\overline{x^2}the mean of the squares; these are the ordinary least squares coefficients.xandycan be losses, claim counts or loss ratios. - Three familiar methods are special cases.
b = 0is the budgeted loss method,L(x) = k, as in the expected loss method.a = 0is the link ratio method,L(x) = cx, as in the chain ladder.b = 1is Bornhuetter-Ferguson,L(x) = a + x. Least squares lets the data choosebrather than fixing it, and Brosius notes that BF's fixedb = 1is a real limitation when losses develop downward. - It is a credibility weighting. With
c = \bar{y}/\bar{x}as the link ratio andZ = b/c, the fit isL(x) = Z\,(cx) + (1 - Z)\,\bar{y}, a credibility blend of the link ratio estimate and the budgeted loss. Brosius's Development Formula 2 gives the theoretical weightZ = VHM/(VHM + EVPV). Here the EVPV,E[\mathrm{Var}(X \mid Y)], measures noise in the reporting process, and the VHM,\mathrm{Var}(E[X \mid Y]), measures noise in loss occurrence. Formula 1 is the distribution-free form,L(x) = (x - E X)\,\mathrm{Cov}(X,Y)/\mathrm{Var}(X) + E Y(see Bühlmann Credibility). - Cautions. If
a < 0, the estimate is negative for smallx, so substitute the link ratio method. Ifb < 0, the estimate falls asxrises, so substitute the budgeted loss method. The method assumes every year shares one pair of loss and reporting distributions, so it suits random fluctuation rather than systematic change. Put years on a constant-dollar basis for inflation, and divide by premium or another exposure when the book grows, before fitting. When the book has changed (a new coverage or tort reform), estimate EVPV and VHM from selected means and standard deviations instead. - In a triangle, Brosius develops the most mature years first. He then uses their projected ultimates as the
yvalues for fitting successively less mature years, soZrises andafalls as the years mature.
Fitting the Line and Reading It as Credibility Incurred losses ($000s) for five accident years at
15months (x) and27months (y):
AY xy1 20302 35443 15264 45495 3042The current year has
x = 40. Estimate its27-month value by least squares, and compare the link ratio, budgeted loss and BF estimates.Answer The averages are
\bar{x} = 29,\bar{y} = 38.2and\overline{x^2} = 955, and\overline{xy} = 5{,}995/5 = 1{,}199:\begin{align*} b &= \frac{1{,}199 - 29(38.2)}{955 - 29^2} \\ &= \frac{91.2}{114} \\ &= 0.8 \\ a &= 38.2 - 0.8(29) \\ &= 15.0 \\ L(40) &= 15.0 + 0.8(40) \\ &= 47.0 \end{align*}As credibility. The link ratio is
c = 38.2/29 = 1.3172, soZ = 0.8/1.3172 = 0.607:\begin{align*} L(40) &= 0.607(1.3172 \times 40) + 0.393(38.2) \\ &= 0.607(52.69) + 0.393(38.2) \\ &= 47.0 \end{align*}The alternatives:
Method Estimate Budgeted loss, \bar{y}38.2Least squares 47.0BF, 40 + (38.2 - 29)49.2Link ratio, c = \bar{y}/\bar{x}52.7Link ratio, average of y/x55.8The five link ratios run from
1.089to1.733, too noisy to trust fully. Least squares gives61\%weight to the link ratio estimate and39\%to the budgeted loss. A slope below1says a high15-month value partly reflects noise and will not all carry through to27months.
Working Back Through a Loss Ratio Triangle Reported loss ratios, with
36months taken as ultimate:
AY 12mo24mo36mo1 0.200.450.602 0.300.500.623 0.100.400.554 0.250.485 0.18Estimate the ultimate loss ratios for AY 4 and AY 5 by least squares, developing the more mature year first.
Answer AY 4 (24 months to ultimate), fitted on AY 1–3. Here
\bar{x} = 0.45,\bar{y} = 0.59,\overline{x^2} = 0.204167and\overline{xy} = 0.266667:\begin{align*} b &= \frac{0.266667 - 0.45(0.59)}{0.204167 - 0.45^2} \\ &= \frac{0.001167}{0.001667} \\ &= 0.700 \\ a &= 0.59 - 0.700(0.45) \\ &= 0.275 \\ y_4 &= 0.275 + 0.700(0.48) \\ &= 0.611 \end{align*}AY 5 (12 months to ultimate), fitted on AY 1–4. AY 4's projected
0.611joins the data. Now\bar{x} = 0.2125,\bar{y} = 0.59525,\overline{x^2} = 0.050625and\overline{xy} = 0.128438:\begin{align*} b &= \frac{0.128438 - 0.2125(0.59525)}{0.050625 - 0.2125^2} \\ &= \frac{0.001947}{0.005469} \\ &= 0.356 \\ a &= 0.59525 - 0.356(0.2125) \\ &= 0.5196 \\ y_5 &= 0.5196 + 0.356(0.18) \\ &= 0.584 \end{align*}The credibility of the link ratio estimate is
Z = b/c:0.700/1.311 = 0.53at24months and0.356/2.801 = 0.13at12months. The immature year's ultimate rests mostly on the budgeted loss ratio\bar{y} = 0.595. Multiplying each ultimate loss ratio by its earned premium gives the ultimate losses.
Bayesian Credibility After a Change in Coverage A state introduces a tort reform. Before it, ultimate losses of
\$50M were expected; pricing expects a30\%saving, soE(Y) = \$35M with\sigma(Y) = \$7M. Under the new regime,60\%of ultimate is expected to be reported by year-end, with\sigma(X/Y) = 10\%. Reported losses at year-end are\$18M.Why is least squares unsuitable here? Estimate the ultimate by Brosius's credibility formula.
Answer Least squares and the link ratio method both assume that past years share the current year's loss and reporting distributions. The reform broke that, so the prior years'
(x, y)pairs say little about this one. Instead, estimate the two variances directly, assuming (as Brosius does) that the mean and standard deviation ofX/Ydo not depend onY:\begin{align*} VHM &= \mathrm{Var}(0.6\,Y) \\ &= (0.6 \times 7)^2 \\ &= 17.64 \\ EVPV &= E\left[(0.10)^2\,Y^2\right] \\ &= 0.01\,(7^2 + 35^2) \\ &= 12.74 \\ Z &= \frac{17.64}{17.64 + 12.74} \\ &= 0.581 \\ L(18) &= 0.581\left(\frac{18}{0.6}\right) + 0.419(35) \\ &= 32.1 \end{align*}The estimate of
\$32.1M lies between the link ratio estimate (\$30M) and the budgeted loss (\$35M). It sits just above BF,18 + 0.4 \times 35 = \$32.0M: the implied slopeZ/d = 0.968is just under BF's1, so slightly less weight goes to the low reported amount.