Claims Processing Changes
Study guide: Exam 5
Claims Processing Changes are changes in how claims are handled — staffing and caseloads, settlement authority, use of defence counsel, closure targets, outsourcing, reserving philosophy — that alter the timing of payments and case reserve changes, and therefore the shape of the development pattern.
\text{Disposal Rate}_n = \frac{\text{Closed claims at age } n}{\text{Ultimate claim counts}}
\text{Avg Case O/S} = \frac{\text{Case Reserves}}{\text{Open Claims}}
- Processing changes hit the diagonal: they affect every open accident year in the calendar period when the change happens, which is what distinguishes them from a change in one cohort's experience.
- The two diagnostics above separate the two kinds of change. A moving disposal rate is a settlement speed change and distorts paid development; a jump in average case outstanding is a case adequacy change and distorts reported development. Both call for the corresponding Berquist-Sherman adjustment.
- Faster closing inflates the recent paid diagonal, so historical paid factors over-develop it. Slower closing does the reverse. The intuitive answer is usually the wrong sign, which is why the disposal-rate table is computed rather than reasoned about.
- Unlike Claims Coding Changes, which move losses between categories, processing changes genuinely change the emergence curve — so post-change data is describing a different process, not a relabelled one.
- Watch for closed-without-payment activity: a drive to clear old files can raise the closure rate without moving any money, which changes the disposal rate but not the paid pattern. Counting CWP separately reveals it.
A Fast-Track Settlement Programme An insurer introduces fast-track settlement for auto bodily injury in
2022, cutting average time-to-close from18months to9. Historical12–24paid factors for AY2018–2021averaged1.45; AY2022–2023are coming in near1.20.What happens if the historical factor is applied to the recent years?
Answer More of each recent year's ultimate is already paid at
12months, so the12-month paid figure is high relative to its ultimate. Applying1.45— a factor calibrated to a book that had paid much less by12months — overstates ultimate losses for AY2022onward.The observed
1.20is the correct factor for the new process, but two years of it is thin evidence and the change may still be bedding in.Options: restate the historical paid triangle to the current disposal pattern (Berquist-Sherman) so the full history is usable at the new pace; or lean on reported development, which is largely unaffected by closing speed, as the primary method while the paid series accumulates.
Two Changes at Once Diagnostics at
24months across four accident years:
AY Disposal rate Avg case O/S Paid ÷ reported 202156\%\$11{,}0000.44202257\%\$11{,}5000.45202366\%\$14{,}9000.52202471\%\$18{,}2000.56What is happening, and what does it do to the methods?
Answer Both things are happening at once, starting in
2023:
- Disposal rate up from
57\%to71\%— claims closing faster.- Average case outstanding up from
\$11{,}500to\$18{,}200, far beyond any plausible severity trend — case reserves strengthened.That combination is common in practice (a new claims leader often does both) and it is the hardest case, because it distorts both triangles at once:
- Paid development is overstated by the faster closing.
- Reported development is overstated by the strengthening.
Neither triangle can be used as the clean check on the other, which is the usual escape route. What remains:
- Apply both Berquist-Sherman adjustments — restate the paid triangle to a common disposal rate and the reported triangle to current case adequacy — and compare the two restated results.
- Lean on methods that do not depend on the triangle's recent diagonal at all: the expected claims technique and BF with an externally derived ELR.
- Use frequency-severity on closed claims with a disposal-rate projection, which handles the settlement change explicitly.
And document heavily: with both distortions active, the estimate rests far more on judgment than usual, and the report should say so.