Case Adequacy
Study guide: Exam 5
Case Adequacy is how close case reserves sit to the eventual settlement cost of the claims they are set on. A change in adequacy over calendar time is one of the two distortions (settlement rate is the other) that make historical development factors misleading.
\text{Avg Case Outstanding} = \frac{\text{Case Reserves}}{\text{Open Claim Counts}}
\text{Adequacy ratio} = \frac{\text{Case reserve at valuation}}{\text{Eventual settlement value}}
- The diagnostic is average case outstanding per open claim, compared down each column of the triangle. It should grow at roughly the severity trend. A jump concentrated on one diagonal, appearing at every maturity at once, is a change in reserving practice, not in claim cost.
- Strengthening raises reported losses immediately, so recent age-to-age factors fall (more of the ultimate is already booked). Applying historical factors — built under weaker reserving — to a strengthened diagonal over-states ultimate, because the strengthening is developed a second time.
- Weakening does the reverse and understates ultimate, which is the more dangerous direction: the reserves are inadequate and the method that is supposed to catch it is biased in the same direction.
- Paid data is immune, so a divergence between paid and reported chain ladder estimates is the corroborating evidence. Rising average case outstanding and reported ultimates running above paid ultimates together confirm a strengthening.
- The remedy is the Berquist-Sherman case adjustment: restate historical average case outstanding to the current adequacy level using a selected severity trend, rebuild the reported triangle, and select factors from the restated history.
- Adequacy also affects the a priori methods indirectly: the Cape Cod ELR is computed from reported losses, so a strengthening inflates it and the distortion enters twice.
Detecting a Shift Average case outstanding per open claim:
AY 12 mo 24 mo 36 mo 2020\$5{,}200\$8{,}000\$12{,}0002021\$5{,}500\$8{,}400\$18{,}1002022\$5{,}700\$14{,}0002023\$9{,}400What happened, and when?
Answer Read down the columns:
12months:5{,}200 \to 5{,}500 \to 5{,}700(about+4.7\%a year), then\$9{,}400— a+65\%jump.24months:8{,}000 \to 8{,}400(+5.0\%), then\$14{,}000—+67\%.36months:12{,}000, then\$18{,}100—+51\%.Every jump is on the latest diagonal, the year ending
12/31/2023, and all are of similar magnitude. This is a case reserve strengthening during calendar2023, of roughly55–65\%over and above the\approx 5\%severity trend.Confirming evidence to look for: reported chain ladder ultimates now exceeding paid chain ladder ultimates, and a stable disposal rate (which would rule out a settlement-speed explanation).
Selecting reported development factors from this triangle unadjusted would over-state ultimate losses substantially — the strengthened diagonal would be multiplied by factors built for a book that reserved
60\%lighter.
Quantifying the Bias A reported triangle's
24–36factor has historically been1.30. Case reserves were strengthened25\%at the end of2024. AY 2023, at24months on12/31/2024, shows paid\$3{,}000{,}000and case reserves\$2{,}500{,}000.Estimate the size of the bias if the historical factor is used unadjusted.
Answer Unadjusted:
(\$3{,}000{,}000 + \$2{,}500{,}000) \times 1.30 = \$7{,}150{,}000Under the old reserving basis, the same claims would have carried case reserves of about
\frac{\$2{,}500{,}000}{1.25} = \$2{,}000{,}000so reported would have been
\$5{,}000{,}000— which is the level the1.30factor was calibrated to:
\$5{,}000{,}000 \times 1.30 = \$6{,}500{,}000The unadjusted estimate is
\$650{,}000(10\%) too high. The strengthening added\$500{,}000to reported losses, and the factor then developed that\$500{,}000by a further30\%as though it were newly emerged loss rather than a re-estimate of claims already counted.The Berquist-Sherman restatement fixes the factor rather than the diagonal: the strengthened reserves stay in the estimate (they are the claims department's current best view), but the development applied to them is re-derived from a consistently-restated history.