CAS Exam 5 Fall 2018, Question 6
Study guide: Exam 5
Two methods of deriving expense provisions in ratemaking include the premium-based projection method and the exposure-based projection method.
Part a (1 point)
For each method, briefly describe how both fixed and variable expenses are treated.
Part b (0.5 points)
Briefly describe one shortcoming (or distortion) of each method.
Answer this question and see the worked solution