Actuarial Notes

Process Risk

Process risk is the variability of actual outcomes around their expected value that would remain even if the model and its parameters were known exactly — the "random" part of a reserve's variability. Together with parameter risk it makes up the prediction error. In Clark (2003), the process variance of a reserve is its expected value times a constant variance-to-mean ratio \sigma^2.

\mathrm{Var}_{\text{process}}(R) = \sigma^2 \sum \mu_{AY;x,y}

\sigma^2 = \frac{1}{n-p}\sum_{AY,t}\frac{(c_{AY,t} - \hat\mu_{AY,t})^2}{\hat\mu_{AY,t}}

  • R is the reserve for a period or group of periods, \mu_{AY;x,y} the expected incremental loss of each accident year between ages x and y, and c the actual increments. There are n increments in the data and p fitted parameters: 3 for Clark's Cape Cod method, or one ultimate per accident year plus \omega and \theta for his LDF method. The formula for \sigma^2 has the form of a chi-square statistic.
  • Where the ratio comes from. Clark assumes each increment is over-dispersed Poisson: a Poisson count times \sigma^2, so E[c] = \mu and \mathrm{Var}(c) = \sigma^2\mu. The same \sigma^2 scales the normalized residuals (c - \hat\mu)/\sqrt{\sigma^2\hat\mu} used to check the fit. The model treats \sigma^2 as fixed and known, which ignores the variance of the variance.
  • It adds across periods; parameter risk does not. Increments are independent in the model, so the process variance of any group of periods is \sigma^2 times its expected total. The process CV of a reserve, \sqrt{\sigma^2/R}, therefore shrinks as the reserve grows. Parameter variance, (\partial R)'\,\Sigma\,(\partial R), comes from parameters shared by every year, and does not diversify this way.
  • Total variance. Clark adds the two, treating them as independent. In his example, parameter risk dominates: on the LDF method's reserve of 28{,}987{,}633, the process standard deviation is 1{,}372{,}966 against a parameter standard deviation of 4{,}688{,}826. He notes that the Cape Cod method may carry somewhat more process variance than the LDF method but much less estimation error. The same split appears elsewhere: in Mack's standard error the 1/\hat C_{i,k} term is process variance (see Prediction Error), and the ODP bootstrap adds process noise to every future cell after resampling for parameter risk (see Stochastic Reserving).
  • Not model risk. Changes in mix of business or in how claims are settled lie outside a model's assumptions. Clark calls these "model variance" (model risk); neither process nor parameter variance measures them.

Process Variance by Year and in Total A Clark Cape Cod fit gives reserves of 1{,}200, 2{,}500 and 4{,}300 for three accident years ($000s), with \sigma^2 = 50. The parameter standard deviation of the total reserve is 900.

Find the process standard deviation and CV for each year and for the total, and the total standard deviation.

Answer Each year's process variance is \sigma^2 times its reserve:

AY Reserve Process SD Process CV
1 1{,}200 \sqrt{50 \times 1{,}200} = 244.9 20.4\%
2 2{,}500 \sqrt{50 \times 2{,}500} = 353.6 14.1\%
3 4{,}300 \sqrt{50 \times 4{,}300} = 463.7 10.8\%

For the total, the process variances add:

\begin{align*}
\mathrm{Var}_{\text{process}} &= 50 \times 8{,}000 \\
&= 400{,}000 \\
\mathrm{SD}_{\text{process}} &= 632.5 \\
\mathrm{SD}_{\text{total}} &= \sqrt{400{,}000 + 900^2} \\
&= 1{,}100.0
\end{align*}

The total's process CV is 632.5/8{,}000 = 7.9\%, below every single year's. Its process standard deviation is also well below the sum of the three, 1{,}062.2, because independent increments partly offset one another. The total CV is 13.75\%, and parameter variance is 810{,}000/1{,}210{,}000 = 67\% of the total variance. That is the pattern Clark reports: at the level of the whole reserve, parameter risk is the larger part.

Testing Next Year's Development Against Its Process Range A loglogistic growth curve G(x) = x^{1.5}/(x^{1.5} + 40^{1.5}) is fitted by Clark's LDF method, with \sigma^2 = 30. At year-end, two accident years are 24 and 36 months old, with estimated ultimates of 5{,}000 and 6{,}000.

Forecast the development over the next calendar year and its process standard deviation. One year later, actual development is 1{,}400. Is that surprising?

Answer The average ages move from 18 to 30 and from 30 to 42. The curve gives G(18) = 0.2319, G(30) = 0.3938 and G(42) = 0.5183:

\begin{align*}
\mu_1 &= 5{,}000 \times (0.3938 - 0.2319) \\
&= 809.5 \\
\mu_2 &= 6{,}000 \times (0.5183 - 0.3938) \\
&= 747.0 \\
\mu &= 1{,}556.5 \\
\mathrm{SD}_{\text{process}} &= \sqrt{30 \times 1{,}556.5} \\
&= 216.1
\end{align*}

The process CV is 13.9\%. The actual development is 1{,}400:

\begin{align*}
r &= \frac{1{,}400 - 1{,}556.5}{216.1} \\
&= -0.72
\end{align*}

That is within one process standard deviation, so it is not surprising. Adding parameter variance would widen the range further. This is why Clark forecasts calendar year development: unlike the ultimate reserve, it can be checked against actual emergence within a year.