Insurance Risk
Study guides: Exam 9, Exam GI-201, Exam ILA-201I, Exam ILA-201U
Insurance Risk is the risk that claims, their timing and the cost of settling them differ from what was expected when the business was priced and reserved. For a P&C insurer it has three parts: underwriting (premium) risk on business written or to be written, reserve risk on claims already incurred, and catastrophe risk from single events that strike many policies at once.
\begin{aligned} \text{Var}(L) &= E\big[\text{Var}(L \mid \theta)\big] \\ &\quad + \text{Var}\big(E[L \mid \theta]\big) \end{aligned}
Lis aggregate loss and\thetathe true, unknown parameters of its distribution. The first term is process risk — randomness given the parameters, which pooling diversifies away (Law of Large Numbers). The second is parameter risk — the chance the parameters are wrong — which does not diversify, because it moves every policy the same way. (Credibility theory splits variance the same way, into the EPV and the VHM.)- Brehm's components of underwriting risk: process risk in frequency and severity (an aggregate loss model); pricing risk from mis-estimation and competitive pressure; parameter risk, subdivided into estimation (too little data), projection (trend and development, often driven by inflation), event (a court ruling, a latent exposure, a new cause of loss) and systematic (drivers that hit all policies together); and catastrophe risk, where the correlation is physical.
- Reserve risk applies the same analysis to liabilities already on the balance sheet — the distribution of unpaid claims (Unpaid Claim Distribution, Stochastic Reserving). For long-tailed lines it is often the largest single risk, and A.M. Best's impairment studies have consistently found deficient reserves and inadequate pricing to be the leading cause of P&C insurer impairment.
- Analysing it quantitatively means giving each part a distribution and a risk measure — coefficient of variation, VaR, TVaR, PML — and combining it with financial risk in the internal risk model.
Parameter Risk Does Not Diversify Given the true mean
\theta, each policy's annual loss has standard deviation\$3{,}000and losses are independent. The mean is estimated at\$1{,}000per policy but is uncertain, with standard deviation\$50. Find the coefficient of variation of total losses for100and10{,}000policies.Answer For
npolicies,\text{Var}(S) = n(3{,}000)^2 + n^2(50)^2.\begin{align*} n = 100: \quad \text{Var}(S) &= 9.0 \times 10^8 + 2.5 \times 10^7 \\ &= 9.25 \times 10^8 \\ \text{CV} &= \frac{30{,}414}{100{,}000} \\ &= 30.4\% \\[6pt] n = 10{,}000: \quad \text{Var}(S) &= 9.0 \times 10^{10} + 2.5 \times 10^{11} \\ &= 3.4 \times 10^{11} \\ \text{CV} &= \frac{583{,}095}{10{,}000{,}000} \\ &= 5.83\% \end{align*}Growing the book a hundredfold cuts the process CV from
30\%to3\%, but the CV can never fall below50/1{,}000 = 5\%: at10{,}000policies parameter risk is already74\%of the variance. Volume diversifies process risk, not parameter risk.
Catastrophe Risk: Same Mean, Different Tail An insurer covers
1{,}000homes worth\$250{,}000each. In book A the homes face independent fires, each destroying a home with probability0.2\%a year. In book B there is no fire risk, but a hurricane with annual probability2\%would damage every home by10\%. Compare the mean, standard deviation and99th percentile of annual loss.Answer Book A.
N \sim \text{Bin}(1{,}000,\ 0.002)homes lost.\begin{align*} E[L_A] &= 2 \times \$250{,}000 \\ &= \$500{,}000 \\ \text{SD}(L_A) &= \$250{,}000\sqrt{1{,}000(0.002)(0.998)} \\ &= \$353{,}000 \end{align*}
P(N \leq 5) = 0.984andP(N \leq 6) = 0.996, so the99th percentile is6homes,\$1.5million.Book B. The loss is
\$25million with probability2\%, else zero: mean\$500{,}000, standard deviation\$25\text{M}\sqrt{0.02 \times 0.98} = \$3.5million, and99th percentile\$25million.Same expected loss; the catastrophe book's 1-in-100 loss is about
17times larger, and writing more homes in the same region does not help. That is why catastrophe risk is managed through exposure limits, reinsurance and cat bonds rather than volume.